(a) All temporary filling of any excavation, trench or other street opening shall be the primary responsibility of the permittee until the permanent restoration of the roadway pavement is completed.
(b) All permanent backfilling or temporary fills shall be of a quality and composition as may be required by the City Manager, or his designee.
(c) All dirt, gravel, sand, etc., used to fill any excavation, trench or other opening as aforesaid, shall be tamped in layers not exceeding six inches in thickness.
(d) Temporary fills shall be kept even with the existing road surface level at all times.
(Ord. 83-16. Passed 9-12-16.)