§ 1199.08 STORM WATER DETENTION.
   (a)   Detention Basins. Dry detention basins are prohibited. All detention basins shall be wet basins and may require aeration devices in their design. The requirement of aeration devices and their installation detail shall be determined and approved by the Technical Review Group.
   (b)   Bio-retention Basins. Bio-retention basins, also known as rain gardens, may be used only when approved by the municipality.
   (c)   Maintenance of Detention Basins. The maintenance of detention basins shall be the responsibility of the property owner or property owners’ association, as applicable, and not the Village of Commercial Point. Such maintenance shall ensure that water in each detention basin or flowing through the detention basin outlet does not restrict the flow of the public storm sewer system.
(Ord. 2021-28, passed 8-16-2021)