All fees shall be computed on a square foot (sq. ft.) per floor basis, including basement and sub-basements, measuring the outside tensions at each floor level, except where fixed.
Use | Fee |
Use | Fee |
One Family Residential | $300.00 per building |
Two and Three Family Residential | $300.00 for the first unit; $200.00 each additional unit |
Multi-family | $300.00 for the first unit and $150.00 for each additional unit per building |
Additions, Garages, Accessory Buildings in Residential Areas including Attached Carports, Patios and Porches, Enclosed Patios and Porches and Decks | $75.00 up to and including 700.00 square feet |
Over 700 square feet, $50.00 plus $5.00 per 100 square feet or fraction thereof | |
$15.00 for open decks with no solid roofs | |
Ohio Basic Building Code | |
All other building and additions thereto as defined in the Ohio Basic Building Code Occupancy Chapters. | |
Plan examination fee | $50.00 per structure or addition plus $3.00 per each 100 square feet or fraction thereof; the maximum fee for a single structure shall not exceed $2,000.00; plan examination is payable upon application for building permit and is nonrefundable |
Development Fee | |
Commercial | $200.00 per acre or fraction thereof, plus $0.02 per square foot of building |
Residential | $200.00 for each unit |
In addition to the above fees, the builder or developer shall pay any late surcharges applicable | |
Occupancy Permit Fees | |
Commercial | $100.00 per unit or per final inspection |
Residential | $50.00 per building unit |
Water Tap Fees | |
For that portion of the village served by the well system | |
Size of Water Tap | Charge |
3/4 inch | $1,385.00 |
1 inch | $2,822.00 |
1-1/2 inch | $7,160.00 |
2 inches | $12,341.00 |
3 inches | $25,945.00 |
For that portion of the village served by the Columbus water system, the Columbus rate plus the following surcharges | |
Size of Water Tap | Charge |
3/4 inch | $120.00 |
1 inch | $216.00 |
1-1/2 inch | $480.00 |
2 inches | $858.00 |
3 inches | $1,932.00 |
4 inches | $3.432.00 |
6 inches | $7,716.00 |
8 inches | $13,716.00 |
10 inches | $21,432.00 |
When there are separate taps for domestic and fire protection, the village collects the full tapping application fee for the domestic tap and five percent of the regular tapping fee for the fire line. | |
Sewer Tapping Fees | |
Since Commercial Point’s fees are based on City of Columbus sewer fees, Commercial Point fees are subject to change, if and when the City of Columbus has a fee increase. | |
Fees are based on the size of the water tap. Listed below are the fees that will be charged. | |
Size of Water Tap | Sewer Tap Charge |
3/4 inch | $1,000.00 |
1 inch | $1,650.00 |
1-1/2 inch | $4,300.00 |
2 inches | $7,400.00 |
3 inches | $15,400.00 |
4 inches | $24,100.00 |
6 inches | $54,400.00 |
8 inches | $96.500.00 |
10 inches | $149,900.00 |
12 inches | $216,750.00 |
16 inches | $240,000.00 |
Building Permit Fee | $100.00 plus $4.00 per each 100 square feet or fraction thereof |
(Ord. 65-93, passed - -1993)