(A) Excavations in streets and alleys for the purpose of constructing, repairing, altering or tapping sewers shall be made in a manner that will impede travel as little as possible. The City Engineer or Public Works Director may determine and limit the time such excavations remain open. Traffic control features, including warning lights, shall be maintained at all unfinished work from dark to daylight in accordance with the current Manual of Uniform Traffic Control Devices.
(B) After work has been completed, the streets or alleys shall be repaired to the satisfaction of the city. Within one year of the excavation, the City Engineer or Director of Public Works may require the excavation to be refilled if settling has occurred.
(Prior Code, § 51.072) Penalty, see § 51.999