§ 1250.22 STORM SEWERS AND STORM WATER DRAINAGE.
   When an adequate public storm sewer is available at a plat boundary, the subdivider shall construct a storm sewerage system and connect such system with the line of such public storm sewer. If such a public storm sewer is not accessible, natural drainage channels with easements of adequate width shall be provided, as determined by the Municipal Engineer and approved by the Planning Commission. Paved gutters or storm sewers shall be required if velocities of flow are greater than specified in § 1250.21 or cause destructive erosion. Storm drainage, including drain tile around basements, shall not be permitted to discharge into any sanitary sewer facility, but shall connect to an adequate drainage outlet.
(Ord. 74-O-129, passed 10-17-1974)