Upon the expiration of the established maintenance period for a street base course, a surface course shall be constructed using either asphaltic concrete, bituminous mix or portland cement concrete. Specific material and thickness recommendations shall be determined by the Municipal Engineer, based upon traffic conditions.
(Ord. 74-O-129, passed 10-17-1974)