§ 177.02  APPLICATION PROCEDURE.
   (A)   When any person shall be desirous of erecting, constructing, reconstructing, converting, altering, enlarging, extending, raising or moving any building, structure, manufactured or prefab housing, as well as fences, concrete flatwork or demolition, within the limits of the City of Colome, South Dakota, he or she shall procure from the city office the application form for the permit as outlined in building permit required under § 177.01 of this chapter.
   (B)   No building permit shall be granted unless all construction performed thereunder, together with all the electrical, water and plumbing services, shall be performed in compliance with the following minimum standards. The building construction must meet the minimum requirements of the Veteran’s Administration or the Federal Housing Administration or the Farmer’s Home Administration. All electrical work shall be done in conformance with the current minimum standards as the same are amended from time to time in the National Electrical Code and the statutes of the State of South Dakota that are applicable thereto and that are in effect at the time of the granting of the given building permit. All pluming, water and sewer construction shall be done in conformance with the current minimum standards, as the same are amended from time to time, of the South Dakota Plumbing Code which are in effect at the time of the granting of the given building permit, as well as any city requirements.
(Ord. 61, passed 6-2-1975; Ord. 170, passed --)