§ 152.205 STORMWATER POLLUTION PREVENTION PLAN.
   (A)   Any person who intends to commence construction or land development activities in the Town must prepare and implement a Stormwater Pollution Prevention Plan (SWPPP) that complies with this chapter and the CGP for all construction activities.
   (B)   The purpose of this plan is to identify construction/contractor activities that could cause pollutants in the stormwater, and to describe measures or practices to control these pollutants during project construction.
   (C)   The SWPPP shall accurately describe the potential for soil erosion and sedimentation problems resulting from land disturbing activity and shall explain and illustrate the measures that are to be taken to control these problems.
   (D)   The length and complexity of the plan is to be commensurate with the size of the project, severity of the site condition, and potential for off-site damage. All plans shall be phased in accordance with the CGP. As necessary, the plan shall be phased so that changes to the site during construction that alter drainage patterns will be addressed by an appropriate phase of the plan.
   (E)   The plan shall be sealed by a registered professional engineer or landscape architect licensed in the state. The plan shall conform to the requirements of this chapter and the CGP.
(Ord. 2012-18, passed 11-12-12)