§ 155.08 PERMIT REQUIRED.
   (A)   A permit shall be obtained before beginning construction, alteration, or repair of any building or structure, the cost of which exceeds $1,000, using forms furnished by the Building Inspector, and all fees required by this chapter shall be paid to the Clerk- Treasurer of the town.
   (B)   No permit is required for repairs as long as there are no modifications or structural change.
(Prior Code, § 7-57) (Ord. 1995-6, passed 11-27-1995) Penalty, see § 155.99