Section
54.01 Purpose and intent
54.02 Acronyms
54.03 Definitions
54.04 General provisions
54.05 Design methodology for storm sewer
54.06 Storm sewer design standards
54.07 Open channel design standards
54.08 Detention basins
54.09 Downstream restrictions
54.10 Sinkholes
54.11 Final drainage plans
54.12 Changes to the approved drainage plan
54.13 Inspection of infrastructure
54.14 Submittals and fees
Appendix A: Runoff Coefficients Based on Land Use, Soil Groups and Slope Range (%)