CHAPTER 54:  DRAINAGE PROVISIONS
Section
   54.01   Purpose and intent
   54.02   Acronyms
   54.03   Definitions
   54.04   General provisions
   54.05   Design methodology for storm sewer
   54.06   Storm sewer design standards
   54.07   Open channel design standards
   54.08   Detention basins
   54.09   Downstream restrictions
   54.10   Sinkholes
   54.11   Final drainage plans
   54.12   Changes to the approved drainage plan
   54.13   Inspection of infrastructure
   54.14   Submittals and fees
   Appendix A: Runoff Coefficients Based on Land Use, Soil Groups and Slope Range (%)