Sec. 9-8-3.3   Subdivision Standards and Required Improvements. 
   (a)   All lots shall provide adequate building space in accordance with the development standards contained in Section 9-8-4. Lots smaller than the minimum required for residential lots may be developed using built-upon area criteria in accordance with Section 9-8-4.
   (b)   For the purpose of calculating built-upon area total project area shall include total acreage in the tract on which the project is to be developed.
   (c)   Storm water drainage facilities. The application shall be accompanied by a description of the proposed method of providing storm water drainage. The subdivider shall provide a drainage system that diverts stormwater runoff away from surface waters, incorporates storm water control measures to minimize water quality impacts, and meets any local requirements.
   (d)   Erosion and sedimentation control. The application shall, where required, be accompanied by the sedimentation and erosion control plan approval by Catawba County Soil and Water.
   (e)   Roads constructed in critical areas and watershed vegetated conveyance areas. Where possible, roads should be located outside of critical areas and watershed vegetated conveyance areas. Roads constructed within these areas shall be designed and constructed to minimize their impact on water quality.
(Ord. of 7-10-23, No. 05-24)