(a) Provide for testing and clean-up as soon as practical, so these operations do not lag far behind the pipe installation. Perform preliminary clean-up and grading as soon as backfill is complete.
(b) Provide positive drainage of finished grade and drain away from structures. Finished grade shall be reasonably smooth, compacted, free from irregular surface changes and comparable to the adjacent existing ground surface.
(c) Seed and mulch disturbed areas.
(d) Upon completion of backfilling, remove and properly dispose of excess material and waste.
(Ord. of 11-7-16; No. 10-16)