(a) Repair damaged pavement structure.
(b) Cut existing pavement for utility installation in straight lines generally parallel to the utility. Properly dispose of removed pavement structure.
(c) Extend pavement patch one foot beyond each side of trench on firm subgrade. Slope new surface to drain.
(d) Asphalt pavements. Replace asphalt pavement with a pavement structure no less than as shown on the Standard Details. For roadways under NC Division of Highways jurisdiction, pavement shall be replaced in accordance with their requirements.
(e) Concrete pavements. Replace concrete pavement with pavement structure equal to existing but no less than six inches. Concrete shall be minimum 3,000 psi. When existing concrete joint is within five feet of trench remove existing concrete to joint. Provide expansion joint at edge of existing concrete. Surface treatment shall match existing.
(f) Curbs, gutters, and sidewalks. Replace curbs and gutters, and sidewalks removed or damaged with similar sections to match the existing. Remove to nearest existing joint.
(g) Approval of other authorities. Pavements under the jurisdiction of the NC Division of Highways shall be subject to the approval of a representative of that Division.
(Ord. of 11-7-16; No. 10-16)