(a) Line work.
(1) Unless otherwise required, all materials and workmanship shall have a one-year warranty from the date of final acceptance by the city. A warranty inspection will be made jointly by the city and contractor/developer approximately 11 months after acceptance to identify needed repairs. All labor, equipment and materials needed to make these repairs, or any other repairs required during the warranty period, shall be the responsibility of the contractor.
(Ord. of 11-7-16; No. 10-16)