Sec. 5-3-44   Pump station.
   (a)   General.
      (1)   Install precast concrete wet well and valve vault in accordance with Paragraph 3.02 - MANHOLES of these specifications.
      (2)   Install pumps and motors in accordance with manufacturer's installation instructions.
      (3)   Electrical work shall be in accordance with all local, state and federal requirements. Contractor is responsible for obtaining all required permits and scheduling inspections. Coordinate electrical service to site with local power company.
(Ord. of 11-7-16, No. 10-16)