Sec. 5-3-7   Warranty/service agreement.
   (a)   Line work. All materials and workmanship shall have a one-year warranty from the date of final acceptance by the city. A warranty inspection will be made jointly by the city and contractor/developer approximately 11 months after acceptance to identify needed repairs. All labor, equipment and materials needed to make these repairs shall be the responsibility of the contractor.
   (b)   Pump station.
      (1)   Pumps shall be provided with the manufacturer's standard warranty or a minimum of one year, whichever is greater. Warranty shall cover all costs including, but not limited to, parts, labor, equipment and travel. Warranty will begin on the date of substantial completion.
      (2)   Engine generator system and transfer switch shall be provided with a five- year warranty. Warranty shall cover all costs including, but not limited to, parts, labor, equipment and travel. Warranty will begin on the date of substantial completion.
      (3)   A two-year service plan for the engine generator set to become effective on the date of substantial completion shall be provided. The plan shall include semi-annual inspections. Provide a detailed report of each service visit. Each of the following checks and services shall be performed at least annually:
         a.   Oil change; check for leaks.
         b.   Oil filter replacement.
         c.   Engine check; inspect, run and test.
         d.   Fuel tank test for water and leaks.
         e.   Check for hose leaks.
         f.   Top off of fluids.
         g.   Automatic transfer switch test.
         h.   Inspection of housing for corrosion, unusual noises, and excessive vibration.
         i.   Inspection and cleaning of batteries. Seal terminals and check voltage.
         j.   Analysis of oil for contaminates.
         k.   Fuel filter replacement.
         l.   Replace air filter.
      (4)   All other components of the pump station, including the control panel shall be provided with a minimum of a one year warranty. Warranty shall cover all costs including, but not limited to, parts, labor, equipment and travel. Warranty will begin on the date of substantial completion. A warranty inspection will be made jointly by the city and contractor/developer prior to the expiration of the various warranties.
(Ord. of 11-7-16, No. 10-16)