Sec. 5-3-4   Submittals.
   Submit the following to the City of Claremont and obtain approval from the City's Public Works Department prior to beginning work:
   (a)   All related design calculations, sealed as required by a professional engineer licensed to practice in North Carolina.
   (b)   Affidavit of compliance. Affidavit shall attest that supplied products conform to the referenced standard and this specification and that tests set forth in each applicable referenced publication have been performed and that test requirements have been met. Affidavits shall be provided for all pipe, ductile iron pipe liner, valves, pre-cast structures, pumps, generators, switch gears and other items as requested by the city.
   (c)   Catalog data. Submit manufacturer's standard drawings or catalog cuts for all pipe, ductile iron pipe liner, valves, pre-cast structures, (including steps, pipe connectors, joint materials, castings) service saddles, pumps, access hatches, lifting hoists, float switches, pressure gauges, generators, switch gears, and other items as requested by the city.
   (d)   Shop drawings. For pump stations submit shop drawings for the following:
      (1)   Pumps
      (2)   Pre-cast wet wells
      (3)   Valve vault
      (4)   Access hatches
      (5)   Lifting hoist
      (6)   Float switches
      (7)   Pressure gauges
      (8)   Valves
      (9)   Dimensional drawing showing position of equipment in respect to access hatches.
      (10)   Electrical diagram(s) for complete operating system, including pumps, generator, automatic switch gear and control panel.
      (11)   Layout of control panel face.
   (e)   Manufacturer's installation procedures.
   (f)   Prior to final acceptance, submit test reports, in booklet format, including but not necessarily limited to the following:
      (1)   Field test report for each section of pipe installed including:
         a.   Pressure tests for force mains.
         b.   Low pressure air test for gravity mains.
         c.   Vacuum test for manholes or other pre-cast structure.
      (2)   Pump drawdown tests.
      (3)   Air/vacuum relief valves, surge relief valves, check valves.
      (4)   Start-up report and load test results, including operation of automatic switch gear.
   (g)   Prior to final acceptance, submit manufacturer's complete operation and maintenance manuals for all valves and all components of the pump station including the generator and automatic transfer switch.
   (h)   Prior to final acceptance, provide a parts list for each piece of equipment including type and quantity of part recommended for stock.
(Ord. of 11-7-16, No. 10-16)