5.3.3 WATER FACILITIES DESIGN
Until September 1, 2025, any lot that is created in conformance with the requirements for (1) land splits not requiring a subdivision in Section 5.2.6, or (2) a combination of the minor subdivision and rural subdivision provisions in Sections 5.2.7 and 5.2.8 of these Subdivision Regulations, may be developed without connecting to the Town’s water system, even if the lot is served at the time of building permit application.
See Town Code Title V for all other regulations.
(Ord. 2020-885, passed 9-8-2020; Ord. 2022-923, passed 10-11-2022)