§ 152.048 STANDARDS FOR SUBDIVISIONS.
   (A)   All new subdivision proposals and other proposed development (including proposals for mobile home parks or subdivisions) greater than 50 lots or five acres, whichever is the lesser, shall:
      (1)   Identify the flood hazard area and the elevation of the base flood; and
      (2)   For all final subdivision plans and plats, provide the elevation(s) of proposed structure(s) and pads. If the site is filled above the base flood, the final lowest floor and pad elevation shall be certified by a registered professional engineer or surveyor and provided to the Floodplain Administrator.
   (B)   All subdivision proposals and other proposed development shall be consistent with the need to minimize flood damage.
   (C)   All subdivision proposals and other proposed development shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage.
   (D)   All subdivisions and other proposed development shall provide adequate drainage to reduce exposure to flood hazards, including easements dimensioned to facilitate construction and maintenance of drainage facilities, and shall not concentrate or increase flows without providing remedial works.
   (E)   All subdivision plan and other proposed development submittals shall include the information, and shall be in the form required by the Floodplain Administrator.
(Ord. 2019-863, passed 1-8-2019)