§ 51.060 APPROACH MAINS; LENGTH OF EXTENSIONS.
   Where no water or sewer main exists along the frontage of a lot, and the developer or owner of the lot requests water and/or sewer service, sufficient length of main shall be constructed by the developer or owner to extend the main from the point of connection at the existing main to the full frontage, rearage, or sideage of the property.
(Ord. 04-578, passed 7-22-2004; Am. Ord. 2022-913, passed 2-22-2022)