(A) The town will develop a water system master plan to identify the general location and sizing of all central water system infrastructure required throughout certain designated areas of the community.
(B) The developer will be responsible for all costs for the design, and construction of all water system infrastructure in general conformance with the master plan, or any revisions thereto.
(Ord. 04-578, passed 7-22-2004; Am. Ord. 2022-913, passed 2-22-2022)