§ 53.24  EXCAVATIONS.
   (A)   All excavations required for the installation of a building sewer shall be open trench work, unless otherwise approved by the City Manager. Trenches shall be adequately guarded with barricades and lights so as to protect the public from hazard.
   (B)   Backfill shall be performed in accordance with good practice to 95% density, except that no backfill shall be placed until the work has been inspected.
   (C)   Streets, sidewalks, parkways, and other public property, disturbed in the course of the work, shall be restored to the original condition of said property or better.
(Ord. passed 3-28-06)  Penalty, see § 53.99