§ 51.35  WASTEWATER CONTRIBUTION PERMIT REQUIRED.
   (A)   It shall be unlawful to discharge without a wastewater contribution permit to the POTW any wastewater except as authorized by the Superintendent in accordance with the provisions of this chapter.
   (B)   All industrial users proposing to connect to or to contribute to the POTW shall obtain a wastewater contribution permit before connecting to or contributing to the POTW. All existing significant users connected to or contributing to the POTW shall obtain a wastewater contribution permit within 180 days after the effective date of this chapter.
(Ord. passed 2-8-94)  Penalty, see § 51.99