1143.09 APPROVAL REQUIRED.
   (a)   The applicant shall comply with the development plan review procedures in Chapter 1111.
   (b)   An applicant proceeding under Section 1143.19 shall comply with the procedures for Conditional Use Certificate in Chapter 1117.
   (c)   The following items shall be provided with an application for a building permit:
      (1)   A report prepared by a licensed professional engineer with the height, design and proof of compliance with nationally accepted structural standards published by the American National Standards Institute/Electronic Industry Association section 222 F, as amended.
      (2)   A soil report complying with the standards of ANSI/EIA 222 F (Annex I: Geotechnical Investigations for Towers), as amended, to document and verify the application to support the tower, the design specifications of the foundation for the tower, and anchors for the guy wires, if used.
      (3)   Towers and antennas shall be designed to withstand sustained winds at the minimum wind speed listed for Geauga County in the TIA/EIA 222 F standards.
      (4)   Towers and antennas shall be designed to withstand ice loads per the ANSI/EIA section 222 F (Annex H: Commentary on Ice Design Criteria for Communications Structures).
      (5)   The tower as designed shall comply with the standards in Section 1143.15.
      (6)   The tower as designed shall comply with all safety regulations of the Federal Aviation Administration.
         (Ord. 3273. Passed 5-9-24.)