549.41 LOG REQUIRED.
   (a)   A record of each explosive event shall be kept by the contractor or blaster upon forms furnished by the City, a copy of which shall be filed with the Planning Commission which shall include the following:
      (1)   Name of company.
      (2)   Blast location.
      (3)   Date and time of blast.
      (4)   Number of holes, depth of holes, spacing and burdens, delay intervals, total weight of explosives fired per day.
      (5)   Distance and direction to the nearest structure neither owned or leased by person, firm or corporation conducting blastings, except high tension lines supporting towers and appurtenances.
      (6)   Name and signature of firm or individual conducting blasting.
      (7)   Weather conditions.
      (8)   Signature of the seismologist and his/her certification of compliance with applicable regulations.
 
   (b)   Such log shall be filed with the Planning Commission and seismologist within twenty-four (24) hours after each blasting event, or prior to the next explosive event if same occurs prior to the expiration of twenty-four (24) hours.
(Ord. 1396. Passed 8-13-92.)