(a) All building sites for principal structures shall have ready access to adequate toilet facilities. Said toilet facilities shall be in place before the building floor or any wall is in place. Said toilet facilities shall normally be on-site, but they may be located up to 300 feet away if written permission is on file at the job site for use of said facilities.
(b) For purposes of this section, “building site” means a lot upon which there are no permanent buildings.
(Ord. 6-05. Passed 8-15-05.)