§ 50.079 MANHOLES, SAMPLING, AND ANALYSES.
   (A)   When required by the town, the owner of any property served by a building sewer carrying industrial wastes shall install a suitable control manhole in the sewer to facilitate observation, flow measurement, and sampling of wastes. Such manhole, when required, shall be accessible and safely located and shall be constructed in accordance with plans approved by the town. The manhole shall be installed by the owner at his or her expense and shall be maintained by him or her so as to be safe and accessible at all times.
   (B)   All tests, flow measurements, and analyses of the characteristics of waters and wastes, to which reference is made in §§ 50.075, 50.076, and 50.078, shall be determined in accordance with “standard methods for the examination of water and sewage” as approved by the town and shall be sampled at the control manhole provided for in this section or from suitable samples taken at such control manhole.
   (C)   Reasonable and actual cost incurred for sampling and analysis of industrial waste water shall be charged to the customer in addition to regular sewer charges.
(`87 Code, § 17-5-5) (Ord. 94-06, passed 3-7-94) Penalty, see § 50.999