If any lot or parcel is to be created within the city where the creation of the lot or parcel does not require the use of the requirements and procedures of Chapters 16.12 and 16.16 of this title, the owner of the lot or parcel to be created shall be required to discuss with the planning director the lot or parcel creation to determine the eventual ability to receive a building permit for the lot or parcel.
(Ord. 1179 § 5.5(A), 1987)