18.12.040 Erosion and sediment control plan.
   A.   The erosion and sediment control plan shall include the following:
      1.   A sequence of construction of the development site, including stripping and clearing; rough grading; construction of utilities, infrastructure and buildings; and final grading and landscaping. Sequencing shall identify the expected date on which clearing will begin, the estimated duration of exposure of cleared areas, areas of clearing, installation of temporary erosion and sediment control measures, and establishment of permanent vegetation.
      2.   All erosion and sediment control measures necessary to meet the objectives of this local regulation throughout all phases of construction and after completion of development of the site. Depending upon the complexity of the project, the drafting of intermediate plans may be required at the close of each season.
   B.   Modifications to the plan, may be authorized by the public works director, or his or her designee. by written authorization to the permittee, and shall include:
      1.   Major amendments of the erosion and sediment control plan submitted to public works director or his or her designee; and
      2.   Field modifications of a minor nature. (Ord. 1397.18, § 1 (part), 2019)