Skip to code content (skip section selection)
Compare to:
   3.11.5   Dedication and Roadway Improvements
      (A)   While such redevelopment projects are not typically required to make roadway or other off-site improvements, dedication of required right-of-way is required as part of the re-use/redevelopment plan approval process.
      (B)   Full dedication of all lands designated by the Cary Transportation Plan is not required if such dedication would result in the removal of required parking spaces or other features needed for the development to operate. In such cases, a partial dedication of lands indicated as needed by the Transportation Plan, but not needed for site functionality may be required.
      (C)   In some cases, if curb and gutter and/or sidewalk/trail installation may be required if it does not exist along the property's frontage, and can be properly located for the ultimate roadway section indicated in the Transportation Plan without disturbing existing functional site features or is needed to provide an important link with existing or future sidewalks/trails.
      (D)   In some cases, grading to the future roadway widening may be required if needed to accommodate landscaping requirements. Postponing landscape requirements may be done if the future widening will ultimately remove the required plantings.
      (E)   If the site is located along an existing two (2) lane roadway, the Transportation and Facilities Director may require roadway improvements to address the use's impact.