If the sanitary sewer system is connected to the District’s existing sanitary sewer system but construction of the site improvements is not complete, the contractor shall install measures to block storm water from entering the sewer system. If winterizing is required by the District Engineer, the contractor shall coordinate with the District about specific requirements.
(Ord. 2019-02, passed 4-25-2019)