§ 33.291 TRASH ENCLOSURE DRAIN REQUIREMENTS.
   (A)   The District only allows wastewater drains in trash enclosure areas that are servicing restaurants or other types of food service facilities (i.e., grocery stores).
   (B)   The drain is required to be connected to the facility’s grease interceptor.
   (C)   A roof shall be placed on the trash enclosure to prevent rainwater from entering the sanitary sewer system. The roof shall extend past open sides without a gate by a distance equal to one-half the height of the opening (i.e., if the bottom of the roof is two feet above the top of the structure wall, it is required to extend one foot past the outside edge of the wall). To allow garbage trucks to access the bins, the roof shall extend six inches past the outside edge of the gate (on the gate side of the structure only).
   (D)   On the open side, a grade break line shall be constructed at the inside edge of the wall with the slab sloping inwards on the inside of the structure and away from the structure on the outside in order to prevent precipitation from entering the floor drains.
   (E)   The ground shall be sloped away from the structure on all other sides.
(Ord. 2019-02, passed 4-25-2019)