(A) Pavement shall be replaced in kind unless otherwise shown on plans or required by the Engineer.
(B) All existing pavement at trench edges shall be saw cut to sound pavement and the exposed surfaces coated with tack coat, applied in accordance with Greenbook § 301 - Roadway Surfacing, just prior to paving.
(C) The pavement shall in all cases be removed to a minimum of six inches outside of the excavation to permit proper keying of the restored pavement.
(Ord. 2019-02, passed 4-25-2019)