15.4.4.1: APPLICABILITY:
   A.   New subdivisions or resubdivisions shall provide stormwater detention as detailed in section 15.8.6.8 of this title.
   B.   The standards in this section shall apply to any development for which a site plan must be submitted in the following cases:
      1.   Any development greater than two (2) acres.
      2.   Any development less than two (2) acres in which there is an expected increase in stormwater runoff when comparing the predevelopment and postdevelopment stormwater drainage calculations. The predevelopment site shall be considered those conditions which existed a maximum of twelve (12) months prior to the site plan being submitted. Detention shall be provided to accommodate the expected increase in stormwater runoff for the site.
   C.   The standards of this section shall not apply to any development located within the BPR, primary business, district. (Ord. 2015-04)