§ 157.081 STRUCTURES AND PROJECTIONS INTO REQUIRED YARDS AND RIGHTS-OF-WAY.
   Every building or structure hereafter erected or established shall be located within the buildable area as defined by this Zoning Ordinance, and in no case shall such buildings extend beyond the buildable area into the respective front, side, rear yards or other setbacks or into public rights-of-way, except for the following:
   (A)   Ornaments, eaves, chimneys, cornices, window sills, awnings and canopies, which may project into any required yard a distance not to exceed two feet.
   (B)   Accessory structures and uses, only as permitted by § 157.059.
   (C)   Awnings in the CBD District, provided they extend over a sidewalk; provided that they consist of light gauge frame; are covered with canvas, vinyl, or similar material; are no closer than two feet to the curb and do not extend more than eight feet from the awning's point of attachment; are no closer than six feet to the trunk of any tree; have a minimum clearance of eight feet above the sidewalk; and a maximum height of 12 feet.
   (D)   Permitted fences and walls, security gates, paths, walkways, mailboxes, utility poles, lighting fixtures, patios at grade, and similar features may be located in a required yard or buffer, so long as the sight triangle on corner lots is not obscured.
   (E)   Permitted signs may be located in an established front or side yard abutting a public street.
   (F)   Off-street parking areas, maneuvering areas for parking, and loading areas, but not including loading structures, are allowed in required yards and setbacks, but are not allowed in required buffers or public rights-of-way.
(Ord. 15-002, passed 2-24-15)