§ 52.25 PROCEDURE FOR CONNECTING TO SEWER.
   (A)   Any person, business or corporation desiring to connect to the sewer line of the town shall make written request to the Town Clerk/Treasurer for permission to connect an individual line to the main sewer line, prior to commencing any work. This request shall be on a form available at the Clerk/Treasurer’s office.
   (B)   All rights-of-way must be obtained by the applicant, at his or her expense, prior to the start of installation.
   (C)   On advice of the town’s consulting engineer or Public Works Director, the town shall advise the applicant of the required size, type, location and specifications, taking into consideration the probable usage of the line in future development.
(Prior Code, § 13.12.110) (Ord. 90-02, passed - -)