1133.09 SANITARY SEWER SYSTEM.
   (a)   All sewers shall comply with the regulations, procedures and design standards set forth in Chapters 925 and 927 of the Codified Ordinances of the City of Bryan.
   (b)   All new sanitary sewers or sanitary sewer system extensions shall meet the requirement of and be subject to the approval of the Ohio Environmental Protection Agency, or its successor, the Ohio Department of Health, and the City Engineer.
   (c)   A sanitary sewer system shall be constructed so as to serve the entire development or subdivision.
   (d)   Each lot shall be provided with a connection to the City sanitary sewer system. The subdivider shall install sanitary sewer in accordance with plans approved by the City Engineer and shall meet the current state requirements with certificate of approval from appropriate state agency, with the construction to be supervised by the City.
   (e)   All sanitary sewer construction shall conform to the specifications of and shall be subject to the approval from the appropriate state agency. The applicant shall supply a certificate of approval from the appropriate state agency.
   (f)   If a housing development, shopping center, commercial or industrial development is proposed, a central sewage collection system and a central water distribution system must be constructed by the development when deemed necessary by the Commission after consultation with local health agencies and legislative bodies.
   (g)   The developer or subdivider shall discharge sanitary sewage into the Municipal system for treatment at a community treatment facility.
   (h)   Storm water shall be excluded from sanitary systems. This includes foundation drains, sump pumped water, eave spouts and other storm water drain facilities.
(Ord. 62-2023. Passed 1-16-24.)