935.03 SEWER CONNECTIONS; INSPECTIONS.
   (a)    All work done shall be inspected by an authorized inspector representing the Municipality upon notification by the plumber at least twelve hours before work will be ready for inspection. Any work covered prior to inspection shall be uncovered by the plumber, and opportunity must be given to inspect the interior as well as the exterior of the pipe. The actual tapping of a connection into the sewer or water main shall be done in the presence of the inspector. No connection shall be covered until inspected and approved in writing.
   (b)    The Municipal Manager shall be the final judge of the quality of all materials and workmanship, and shall have the right to inspect the same at all times. He shall have free access to all buildings and fixtures therein connected with the sewers to inspect such fixtures, and may take samples of any wastes entering the sewer. The Municipal Manager, in any duty prescribed by these rules and regulations, may act through properly authorized representatives.
(Ord. 1990-08. Passed 8-21-90.)