§ 155.058 DISPOSITION OF SPOIL.
   Spoil material resulting from clearing, grubbing and channel excavation shall be disposed in a manner which will:
   (A)   Minimize overbank wash;
   (B)   Provide for the free flow of water between the channel and floodplain unless the valley routing and water surface profile are based on continuous dikes being installed;
   (C)   Not hinder the development of travelways for maintenance;
   (D)   Leave the right-of-way in the best condition feasible, consistent with the project purposes, for productive use by the owner;
   (E)   Improve the aesthetic appearance of the site to the extent feasible; and
   (F)   Be approved by the IDNR or U.S. Army Corps of Engineers (whichever is applicable) if deposited in the floodway.
(Ord. 1995-10 § XII H, passed 10-13-1995)