§ 824.03 MAP AND SPILL PREVENTION PLAN.
    (A)   At the time of the application for the permit required by § 824.01, the person owning or leasing property for the purpose of drilling oil or gas thereon shall provide a map prepared by a registered surveyor at the time of making the application, showing the exact location, by address, where the proposed well is to be drilled. Where no address is assigned, the permanent parcel number and the nearest municipal address to the drilling site shall be set forth. The map should also identify the location, type and size of the proposed pipeline, either above or below ground, and any structure within 300 feet of the well location. Additionally, the map shall indicate the location of all power shut-offs, together with a detailed description of the operation of the same, the location of all transmission lines, the location of oil flow shut-offs, together with a detailed description of the operation of the same, and the location of any access roads and roads to the well and tank site locations. Any amendment to this map shall be immediately filed with the Building Commissioner. If the permit is granted, the map shall remain on file with the City Engineer. Amendments to the map require the approval of the permit authority.
   (B)   Within 30 days of completion of the well, a spill prevention plan must be in effect in accordance with the laws of the state and must be on file at the City Hall and the Fire Chief’s office.
(Ord. 18-98, passed 2-2-1998)