§ 52.04 CONNECTIONS REQUIRED.
   The owner, tenant or occupant of each lot or parcel of land within the town which abuts upon a street or other public way containing a sanitary sewer served or which may be served by the sewage disposal system and upon which lot or parcel a building has been or shall be constructed for residential, or commercial use, shall within 30 days after the placing of the sewage disposal system in operation and the construction of all connections thereto from such sanitary sewer, or within 30 days after the construction of such building, connect such building with such sanitary sewer, and shall cease to use any other method for the disposal of sewage, sewage waste or other polluting matter.
(Ord. 1-84, passed 8-23-1984) Penalty, see § 52.99