(A) Before an applicant conducts any site preparation work, including any excavation, grading, regrading or any other development activity on the subject property, the applicant shall:
(1) Preconstruction meeting. Meet with the City Engineer, Department Director, or designee, and with authorized representatives all other city departments, and private utility and service providers, as applicable in a preconstruction meeting;
(3) Assurance. The city may not require an applicant to post an improvement completion assurance for:
(a) Landscaping or an infrastructure improvement that the city has previously inspected and accepted;
(b) Infrastructure improvements that are private and not essential or required to meet the Building Code, Fire Code, flood or storm water management provisions, street and access requirements, or other essential necessary public safety improvements adopted in a land use regulation; or
(c) Infrastructure improvements within the area proposed to be private or for any infrastructure improvements within the subject property the city requires to be private.
(4) Estimated cost of installation of landscaping and improvements. See §§ 155.140 through 155.145 of this chapter. The applicant engineer’s cost estimates for the installation of all required subdivision improvements shall be provided for review by the City Engineer and approved by the Administrative Land Use Authority, as applicable, to establish the necessary improvements completion assurance in an amount required by § 155.141 of this chapter.
(Prior Code, § 25.05.100) (Ord. 20-03, passed 3-19-2020; Ord. 24-03, passed 2-1-2024)