(A) The applicant shall install a 40-foot long culvert as approved by the Village Engineer, at each entrance or exit, to provide for a gravel cushion at road edge to prevent berm and roadway destruction. Further, a gravel entry path, the construction of which shall be approved by the Village Administrator, shall be laid to reduce the amount of mud being carried to the right-of-way.
(B) The well site shall be landscaped and maintained in a manner as approved by the Planning Commission.
(Ord. 30-1974, § 504.19, passed 7-15-1974; Ord. 01-2002, passed 1-4-2002)