The application for building/zoning permit shall be made in writing and be signed by the owner or applicant attesting to the truth and exactness of all information supplied on the application. Construction on the project shall begin within six months from the date that the permit was issued and shall be substantially completed within one year of the permit issue date. At a minimum, the application shall contain the following information, if applicable to a particular use, and be accompanied by all required fees:
(A) Name, address and phone number of owner;
(B) Legal description of property or lot number;
(C) Existing use;
(D) Proposed use;
(E) Zoning district;
(F) Plans drawn to scale, showing the actual dimensions and the shape of the lot to be built upon; the exact size and location of existing buildings on the lot, if any; and the location and dimensions of the proposed building(s) or alteration;
(G) Building heights;
(H) Number of off-street parking spaces or loading berths and their layout;
(I) Location and design of access drives;
(J) Number of dwelling units;
(K) Signage information, if applying for a building/zoning permit for a sign;
(L) If applicable, the approved conditional use permit, or a temporary use permit, or variance;
(M) Such other documentation as may be necessary to determine conformance with, and to provide for the enforcement of this Zoning Code;
(N) Site plan in triplicate to the required contents stated in § 153.258 for any new construction, of any principally or conditionally permitted use, except single-family and two-family dwellings;
(O) Plans showing that the residential unit meets the residential design and appearance standards in § 153.068;
(P) Detention basin information;
(Q) Flood Zone information; and
(R) Type of dust-free, hard surface.
(Ord. 03-04, passed - -2002)