CHAPTER 53: STORMWATER MANAGEMENT
Section
General Provisions
   53.001   Authority and title
   53.002   Applicability and exemptions
   53.003   Background
   53.004   Findings
   53.005   Purpose
   53.006   Abbreviations
   53.007   Definitions
   53.008   Responsibility for administration
   53.009   Conflicting ordinances
   53.010   Interpretation
   53.011   Disclaimer of liability
Prohibited Discharges and Connections
   53.020   Applicability and exemptions
   53.021   Prohibited discharges and connections
   53.022   Exempted discharges and connections
   53.023   Storage of hazardous or toxic material
   53.024   Private property maintenance duties
   53.025   Spill reporting
   53.026   Inspection and monitoring
Stormwater Quantity Management
   53.035   Applicability and exemptions
   53.036   Policy on stormwater quantity management
   53.037   Calculations and design standards and specifications
   53.038   Drainage easement requirements
   53.039   Placement of utilities
   53.040   Structures near county-regulated drains
   53.041   Inspection, maintenance, record keeping, and reporting
Stormwater Pollution Prevention for Construction Sites
   53.050   Applicability and exemptions
   53.051   Policy on stormwater pollution prevention
   53.052   Calculations and design standards and specifications
   53.053   Inspection, maintenance, record keeping, and reporting
Stormwater Quality Management for Post-Construction
   53.065   Applicability and exemptions
   53.066   Policy on stormwater quality management
   53.067   Calculations and design standards and specifications
   53.068   Easement requirements
   53.069   Inspection, maintenance, record keeping, and reporting
Dams and Levees
   53.075   Requirements
Permit Requirements and Procedures
   53.080   Conceptual drainage plan review
   53.081   Permit procedures
   53.082   Information requirements
   53.083   Review of individual lots within a permitted project
   53.084   Changes to plans
   53.085   Fee structure
   53.086   Required assurances
   53.087   Terms and conditions of permits
   53.088   Certification of as-built plans
Enforcement
   53.100   Compliance with this chapter
   53.101   Stop work order
   53.102   Failure to comply or complete
   53.103   Suspension of access to the storm drain system
   53.104   Corrective action
   53.105   Appeals
   53.999   Penalty
   Appendix A: Permit approval process