(A) The connection of a building sewer into a wastewater sewer shall conform to the requirements of the Building and Plumbing Code or other applicable requirements to the district or to the procedures set forth in appropriate specifications of the ASTM or the WPCF. The connections shall be made gas-tight and watertight and verified by proper testing. Any deviation from the prescribed procedures and materials must be approved in writing by the manager before installation.
(B) The connection of a surface runoff or groundwater drain to a storm sewer or natural outlet designed to transport surface runoff or groundwater drainage shall conform to the requirements of the applicable Building Code or other applicable requirements of the district. The connection of any drain to a wastewater sewer under special permit as provided under § 51.061(A) shall conform to the requirements specified by the manager as a condition of approval of the permit.
(Ord. 610.3, passed 8-28-90) Penalty, see § 51.999