9-4-12: IDAHO STATE PLUMBING CODE AMENDMENT, SECTION 104.3.1, CONSTRUCTION DOCUMENTS:
Section 104.3.1 of the "Idaho State Plumbing Code" is hereby repealed and replaced to read as follows:
104.3.1 Construction Documents. Any person legally entitled to apply for and receive a permit shall make such application on forms provided for that purpose. A description of the proposed work shall be provided in accordance with Boise City Code. The City may require plans, specifications, or drawings and such other information as deemed necessary by the code official or as required by Boise City submittal checklists. Construction documents shall be drawn to scale and shall be of sufficient clarity to indicate the location, nature, and extent of the proposed work and shall show in detail that the work conforms to the provisions of this Chapter. The City may require such plans to be stamped and signed by an engineer licensed by the State of Idaho. Engineers that stamp plumbing drawings for review by the City must have a valid and registered stamp that complies with the most current provisions of Idaho Code, Title 54 Chapter 12 (Engineers and Surveyors). The requirement for engineered drawings shall be in compliance with Boise City submittal checklists for the type of construction proposed or as deemed necessary by the code official. If the City determines that the plans, fees, specifications, drawings, description, and information furnished by the applicant are in compliance with this Chapter, then a permit may be issued.
Exception: The code official shall have the authority to waive the submission of construction documents, calculations, or other data if the nature of the proposed work is such that the reviewing of construction documents is not necessary to determine that the proposed work is in compliance with this Chapter.
(Ord. 20-19, 6-11-2019)