Loading...
9-1A-30: IBC BUILDING CODE AMENDMENT, SECTION 109.6, FEE REFUNDS:
   109.6 Fee Refunds. The building official shall not authorize the refund of any fee, except upon written request by the original permittee or owner's representative made not later than 180 calendar days after payment.
   The building official may authorize a refund of any fee paid which was erroneously paid or collected.
   The building official may authorize a refund of 100 percent of the permit fee less any administrative fees, paid when no work has commenced under a permit issued in accordance with this code.
   The building official may authorize a refund of not more than 80 percent of the plan review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn or canceled before any plan reviewing is done.
   Third-party processing fees shall not be refunded.
(Ord. 44-17, 12-19-2017, eff. 1-1-2018; amd. Ord. 39-20, 12-1-2020, eff. 1-1-2021)
9-1A-31: IBC BUILDING CODE AMENDMENT, SECTION 110.3.3, LOWEST FLOOR ELEVATION:
   110.3.3 Lowest Floor Elevation. In addition to the initial elevation certificate required at time of permit application in flood hazard areas, upon placement of the lowest floor, including the basement, a second elevation certification required in the Flood Hazard regulations of the Boise Development Code and Section 1612.4 shall be submitted to the building official or designee prior to the request for a framing inspection.
(Ord. 44-17, 12-19-2017, eff. 1-1-2018; amd. Ord. 39-20, 12-1-2020, eff. 1-1-2021)
9-1A-32: IBC BUILDING CODE AMENDMENT, SECTION 110.6, APPROVAL REQUIRED:
   110.6 Approval required. Work shall not be performed beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official or designee, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or shall notify the permit holder or agent of the permit holder where the work fails to comply with this code. Any work or portion thereof that does not comply shall be corrected and shall not be covered or concealed until authorized by the building official. A final inspection and approval is required upon completion and prior to occupancy and use of all buildings and structures.
(Ord. 44-17, 12-19-2017, eff. 1-1-2018; amd. Ord. 39-20, 12-1-2020, eff. 1-1-2021)
9-1A-33: IBC BUILDING CODE AMENDMENT, SECTION 111.1, CHANGE OF OCCUPANCY, EXCEPTION DELETED:
111.1 Change of occupancy. Exception is deleted.
(Ord. 44-17, 12-19-2017, eff. 1-1-2018; amd. Ord. 39-20, 12-1-2020, eff. 1-1-2021)
9-1A-34: IBC BUILDING CODE AMENDMENT, ADD SECTION 111.1.1, COMMERCIAL OCCUPANCY EVALUATION REQUEST:
   111.1.1 Commercial occupancy evaluation request. Where no work requiring a building permit is occurring and a commercial tenant lacks a certificate of occupancy, desires to obtain a certificate of occupancy or is required to obtain a certificate of occupancy from a department of the City, the Division of Building Safety shall create a permit application with a review and inspection process in order to issue a new certificate of occupancy. A fee shall be charged in accordance with the provisions of the Boise City Building Code Fee Schedule, as adopted by the City Council, for services to establish a certificate of occupancy.
(Ord. 44-17, 12-19-2017, eff. 1-1-2018; amd. Ord. 39-20, 12-1-2020, eff. 1-1-2021)
9-1A-35: IBC BUILDING CODE AMENDMENT, ADD SECTION 111.2.1, CERTIFICATE OF COMPLETION:
   111.2.1 Certificate of Completion. A Certificate of Completion may be issued in lieu of a Certificate of Occupancy when the scope of work of a permit does not affect, alter, or change the occupant load, occupancy group, or occupancy use classification of a tenant space, structure, or portion of a structure. The work described within the scope of work of a permit is deemed to be complete and in substantial compliance by the Planning and Development Services Department with adopted building codes when a final inspection has occurred and a Certificate of Completion has been issued.
(Ord. 44-17, 12-19-2017, eff. 1-1-2018; amd. Ord. 39-20, 12-1-2020, eff. 1-1-2021)
Loading...