(B) However, the following review approvals are not delegated to the city and shall require review or permits from IDNR/OWR:
(1) Organizations which are exempt from this chapter, as per the Illinois Compiled Statutes;
(3) An engineer’s determination that an existing bridge or culvert crossing is not a source of flood damage and the analysis indicating the proposed flood profile, per § 156.062(C)(5) of this chapter;
(4) An engineer’s analysis of the flood profile due to § 156.062(C)(4) of this chapter;
(5) Alternative transition sections and hydraulically equivalent compensatory storage as indicated in § 156.062(C) of this chapter;
(6) Permit issuance of structures within, under or over publicly navigable rivers, lakes and streams; and
(7) Any changes in the mapped floodway or published flood profiles.
(Prior Code, § 157.029) (Ord. 08-023, passed 7-22-2008)