Skip to code content (skip section selection)
Compare to:
Sec. 46-182. Line and grade for new construction.
   (a)   When application is made for the permit required by section 46-178, the public works department shall, within seven days, place grade stakes on the ground to cover the extent of construction applied for. These grade stakes shall determine the line and grade of the curb and gutter or sidewalk to be built and such curb and gutter or sidewalk shall be built to that line and grade.
   (b)   Information about line and grade shall be furnished to the applicant by means of a cut sheet, which shall show the location of proposed construction by an offset from the stakes, and shall show the grade by means of cuts or fills from the elevation of the stakes. No work whatever shall be done on the construction of any curb and gutter or sidewalk without first obtaining such cut sheet.
(Prior Code, § 17-37; Ord. of 7-28-1959; Ord. of 8-25-1959)